Kings Cross Triangle Site Bounded by York Way, East Coast Main Line & Channel Tunnel Rail Link London
Received
| Reference | 2018/5930/P |
|---|---|
| Authority | London Borough of Camden |
| Address | Kings Cross Triangle Site Bounded by York Way, East Coast Main Line & Channel Tunnel Rail Link London |
| Application type | No objection The category of planning permission being sought — for example, "householder" covers extensions and alterations to an existing home. |
| Status | Received Current stage of the application: Received (submitted), Validated (checked for completeness), Decided (outcome issued), Withdrawn (applicant cancelled), or Appeal (applicant is appealing a refusal). |
| Council portal | View on council website ↗ |
Request for observations to the adjoining borough of Islington for revised reserved matters relating to Buildings W1 and W2 comprising 12 to 17 storeys of mixed use accommodation comprising 218 residential units; four retail units at lower ground floor and podium levels (flexible class A1-A4); and associated cycle and disabled car parking, loading bay, refuse stores, storage, plant areas provided within the shared lower ground floor/basement area. The revision to the reserved matters granted approval under application ref: P/2016/1030/RMS include: changes to internal layouts including revision to unit mix; an increase in total GEA of 190 m2; minor changes to building elevations; an increase in green roof area; a revised retail service strategy; and the removal of 6 no. car parking spaces (P2018/3844/RMS)
- Received —
- Validated — The date the council confirmed the application was complete enough to be formally considered. The statutory 8-week determination clock typically starts here.
- Decided 6 December 2018
Map data © OpenStreetMap contributors.
Be first to know about planning applications near this address. Free for one location.
Set up alerts